Project

General

Profile

Launch2 » History » Version 3

Joseph Foley, 2012-03-18 14:01
checkin and tracking

1 1 Joseph Foley
h1. Launch2
2
3
h2. Timeline
4
5 2 Joseph Foley
Saturday, March 17
6
7
The launch
8
9 1 Joseph Foley
* 7:30 Team meets, eats breakfast.  Discovered that the smartphone did not charge.
10
* 8:15 Load truck, moved to hanger
11
* 9:30 Ragnar Rafn Eðvaldsson begins running down the checklist.
12
* 9:35 Sverrir Haraldsson finishes filling the balloon
13
* 10:55 Vikar Hlynur Þórisson attaches all the GoPro Cameras
14
* 11:10 Electronics are turned on and sealed into box.  Niklas Joel Meier turns on the logger and failsafe.
15
* 11:16 Kristjan Kristján Gerhard Karlsson Grimm gets launch clearance
16
* 11:25 Balloon launch from Reykjavik University
17
* 12:57 Balloon popped at 34000 altitude.  (APRS did not capture exact)
18
* 13:25 Crash at Coordinates N64.37315, W19.24017 from SPOT
19
* 13:46 Þórður Sigurbjartsson, Arní from CCP, meet with NORSK Rescue Helicopter at RVK airport (we watched from U215)
20
* 14:19 Heli takes off
21 2 Joseph Foley
* 17:00 Heli returns, unsuccessful
22
* 17:30 Debrief with pizza
23
* 19:00 Discover possible issue, GPS coordinates in wrong format for helicopter.  Plans for recovery tomorrow.
24
25
Sunday, March 18
26
27 3 Joseph Foley
Skyward sword to the rescue, led by Páll Pálsson.  Tracking by Jon Þór Jonsson via the Tetra radio GPS being carried by .  Attempted checkin with Joe Foley at RU every hour starting at 12:00.
28 2 Joseph Foley
29
* 5:00 Planned to head out
30
* 9:45 Last transmission of the SPOT
31
* ?? One superjeep gets broken driveshaft, has to be repaired
32
* ?? Many attempts to follow road require detours and very slow progress.
33
* 12:30 Snow becomes bad?
34
* 13:50 Arrival at location