Actions
Launch2 » History » Revision 3
« Previous |
Revision 3/20
(diff)
| Next »
Joseph Foley, 2012-03-18 14:01
checkin and tracking
Launch2¶
Timeline¶
Saturday, March 17
The launch
- 7:30 Team meets, eats breakfast. Discovered that the smartphone did not charge.
- 8:15 Load truck, moved to hanger
- 9:30 Ragnar Rafn Eðvaldsson begins running down the checklist.
- 9:35 Sverrir Haraldsson finishes filling the balloon
- 10:55 Vikar Hlynur Þórisson attaches all the GoPro Cameras
- 11:10 Electronics are turned on and sealed into box. Niklas Joel Meier turns on the logger and failsafe.
- 11:16 Kristjan Kristján Gerhard Karlsson Grimm gets launch clearance
- 11:25 Balloon launch from Reykjavik University
- 12:57 Balloon popped at 34000 altitude. (APRS did not capture exact)
- 13:25 Crash at Coordinates N64.37315, W19.24017 from SPOT
- 13:46 Þórður Sigurbjartsson, Arní from CCP, meet with NORSK Rescue Helicopter at RVK airport (we watched from U215)
- 14:19 Heli takes off
- 17:00 Heli returns, unsuccessful
- 17:30 Debrief with pizza
- 19:00 Discover possible issue, GPS coordinates in wrong format for helicopter. Plans for recovery tomorrow.
Sunday, March 18
Skyward sword to the rescue, led by Páll Pálsson. Tracking by Jon Þór Jonsson via the Tetra radio GPS being carried by . Attempted checkin with Joe Foley at RU every hour starting at 12:00.
- 5:00 Planned to head out
- 9:45 Last transmission of the SPOT
- ?? One superjeep gets broken driveshaft, has to be repaired
- ?? Many attempts to follow road require detours and very slow progress.
- 12:30 Snow becomes bad?
- 13:50 Arrival at location
Updated by Joseph Foley almost 13 years ago · 20 revisions