Saturday, March 17
6
7
The launch
8
9 1 Joseph Foley
* 7:30 Team meets, eats breakfast.  Discovered that the smartphone did not charge.
10
* 8:15 Load truck, moved to hanger
11
* 9:30 Ragnar Rafn Eðvaldsson begins running down the checklist.
12
* 9:35 Sverrir Haraldsson finishes filling the balloon
13
* 10:55 Vikar Hlynur Þórisson attaches all the GoPro Cameras
14
* 11:10 Electronics are turned on and sealed into box.  Niklas Joel Meier turns on the logger and failsafe.
15
* 11:16 Kristjan Kristján Gerhard Karlsson Grimm gets launch clearance
16
* 11:25 Balloon launch from Reykjavik University
17
* 12:57 Balloon popped at 34000 altitude.  (APRS did not capture exact)
18
* 13:25 Crash at Coordinates N64.37315, W19.24017 from SPOT
19
* 13:46 Þórður Sigurbjartsson, Arní from CCP, meet with NORSK Rescue Helicopter at RVK airport (we watched from U215)
20
* 14:19 Heli takes off
21 2 Joseph Foley
* 17:00 Heli returns, unsuccessful
22
* 17:30 Debrief with pizza
23
* 19:00 Discover possible issue, GPS coordinates in wrong format for helicopter.  Plans for recovery tomorrow.
24
25
Sunday, March 18
26
27
Skyward sword to the rescue, led by Páll Pálsson
28
29
* 5:00 Planned to head out
30
* 9:45 Last transmission of the SPOT
31
* ?? One superjeep gets broken driveshaft, has to be repaired
32
* ?? Many attempts to follow road require detours and very slow progress.
33
* 12:30 Snow becomes bad?
34
* 13:50 Arrival at location