h1. FRDPRC Analysis
2
3 2 Joseph Foley
This needs to be refined into a full FRDPRC table.  Explanation at http://web.mit.edu/2.75/resources/FUNdaMENTALS.html
4
in Chapter 1, page 1-14.
5
6 1 Joseph Foley
h2. Functional Requirements (What)
7
8
# Stay up long enough to finish the job
9
## Balloon (or lifting system) must not break during its time
10
# Fly up in the air
11
# High altitude weatherproof
12
## Withstand the cold temperature
13
## Withstand the forces from the wind
14
## Withstand the rain
15
## Resistant to bird impact
16
# Trackable
17
# Visible in the air, at night, landing, and birds
18
# Record video and store
19
## Camera lens must stay clear
20
## Display of Avatar must stay clear
21
# Land on the sea and float
22
# Withstand impact on landing
23
# Store and display the avatars
24
# Has to be transportable by van
25
# Assemble it on the launch site
26
# Test system before launch
27
# How to gracefully land after done with video
28
# Datapackage easily shipped
29
# High value components easily removed
30
## Datapackage easily removed
31
# Easy to download the data
32
# Done by the FanFest
33
34
h2. Design Parameters (How)
35
36
1. Balooon big enough to float it up for the whole time.  Durable enough to not break.
37
2. Lighter than air He2 or H2
38
3. Use corrosion resistant materials.  Plastics with a glazing point below the ambient temperature.
39
4. GPS system for tracking.
40
5. Vibrant colors and reflectors.  Blinking or flashing lights.
41
6. Record video with a camera and a memory stick.  Rugged camera.
42
7. ,8., 13 Only the databox come down when finished. Parachute deploy when it comes down.  POM plastic sphere case around it.  Enough air to float.
43
9. Flatpanel display. Store on storage medium (flash, magnetic, wireless)
44
10. Volume and weight.  Way to lift it into the van.  Maximum dimension must be smaller than ??
45
11. Tools (not needed or needed). If needed have it including if we have to replace it.  If disassembly after used, then same applies for landing site.  Stick to general hand tools (hammer, screwdriver)
46
12. We can run it on the ground at the takeoff site.  Well developed inspection protocol -- prelaunch checklist.  Need a way to get some data off it while on the launch site.  Go to launch site before and do some tests.
47
14. Small as possible with address on it. Prize for returning.  Limit the distance and/or time so we can pick it up.  Make it be the procedure to go pick it up.  Really good tracking and lights.
48
15 Connectors between the high-value components and the system
49
16. Software and interfaces that can download the video at RU
50
17. Good disclaimer on all things and use all the time we have