h1. FRDPRC Analysis
2
3
h2. Functional Requirements (What)
4
5
# Stay up long enough to finish the job
6
## Balloon (or lifting system) must not break during its time
7
# Fly up in the air
8
# High altitude weatherproof
9
## Withstand the cold temperature
10
## Withstand the forces from the wind
11
## Withstand the rain
12
## Resistant to bird impact
13
# Trackable
14
# Visible in the air, at night, landing, and birds
15
# Record video and store
16
## Camera lens must stay clear
17
## Display of Avatar must stay clear
18
# Land on the sea and float
19
# Withstand impact on landing
20
# Store and display the avatars
21
# Has to be transportable by van
22
# Assemble it on the launch site
23
# Test system before launch
24
# How to gracefully land after done with video
25
# Datapackage easily shipped
26
# High value components easily removed
27
## Datapackage easily removed
28
# Easy to download the data
29
# Done by the FanFest
30
31
h2. Design Parameters (How)
32
33
1. Balooon big enough to float it up for the whole time.  Durable enough to not break.
34
2. Lighter than air He2 or H2
35
3. Use corrosion resistant materials.  Plastics with a glazing point below the ambient temperature.
36
4. GPS system for tracking.
37
5. Vibrant colors and reflectors.  Blinking or flashing lights.
38
6. Record video with a camera and a memory stick.  Rugged camera.
39
7. ,8., 13 Only the databox come down when finished. Parachute deploy when it comes down.  POM plastic sphere case around it.  Enough air to float.
40
9. Flatpanel display. Store on storage medium (flash, magnetic, wireless)
41
10. Volume and weight.  Way to lift it into the van.  Maximum dimension must be smaller than ??
42
11. Tools (not needed or needed). If needed have it including if we have to replace it.  If disassembly after used, then same applies for landing site.  Stick to general hand tools (hammer, screwdriver)
43
12. We can run it on the ground at the takeoff site.  Well developed inspection protocol -- prelaunch checklist.  Need a way to get some data off it while on the launch site.  Go to launch site before and do some tests.
44
14. Small as possible with address on it. Prize for returning.  Limit the distance and/or time so we can pick it up.  Make it be the procedure to go pick it up.  Really good tracking and lights.
45
15 Connectors between the high-value components and the system
46
16. Software and interfaces that can download the video at RU
47
17. Good disclaimer on all things and use all the time we have