Project

General

Profile

Debrief Notes for Test Launch » History » Version 1

Joseph Foley, 2012-02-23 14:42
created issues from the discussion

1 1 Joseph Foley
h1. Debrief Notes for Test Launch
2
3
h2. Issues
4
5
* List of all tools in hanger
6
* Checklist of all parts
7
** Assembly instructions
8
* Better GPS tracking capability.  
9
** Last longer, more frequent
10
* Webcam phone GPS and video needs to re-enable when signal lost
11
* Permit workflow needs to be improved
12
* Use the westward winds at the beginning to limit how far East
13
* More free lift
14
** Way to measure the lift speed
15
* Payload more visible
16
** Strobe lights
17
** Reflectors
18
** Metal to show up on radar
19
* Package stays together.  (Test)
20
* Sea recovery needs to be optimized
21
** Hooks and loops
22
** Markers that stick up from the water
23
* Remind the artist that the spaceship must be light
24
** Get lots of spaceships early on to test and destroy!
25
* Make sure water cannot collect on the device and payload
26
* Weight of the strings in the total weight!
27
* Is the spaceship boyant! Should it be?
28
* Fishing line for everything?
29
** Need to test the different strings at -60C to see if they get brittle
30
* Improve the predictive model stuff