Debrief Notes for Test Launch » History » Version 1
Joseph Foley, 2012-02-23 14:42
created issues from the discussion
1 | 1 | Joseph Foley | h1. Debrief Notes for Test Launch |
---|---|---|---|
2 | |||
3 | h2. Issues |
||
4 | |||
5 | * List of all tools in hanger |
||
6 | * Checklist of all parts |
||
7 | ** Assembly instructions |
||
8 | * Better GPS tracking capability. |
||
9 | ** Last longer, more frequent |
||
10 | * Webcam phone GPS and video needs to re-enable when signal lost |
||
11 | * Permit workflow needs to be improved |
||
12 | * Use the westward winds at the beginning to limit how far East |
||
13 | * More free lift |
||
14 | ** Way to measure the lift speed |
||
15 | * Payload more visible |
||
16 | ** Strobe lights |
||
17 | ** Reflectors |
||
18 | ** Metal to show up on radar |
||
19 | * Package stays together. (Test) |
||
20 | * Sea recovery needs to be optimized |
||
21 | ** Hooks and loops |
||
22 | ** Markers that stick up from the water |
||
23 | * Remind the artist that the spaceship must be light |
||
24 | ** Get lots of spaceships early on to test and destroy! |
||
25 | * Make sure water cannot collect on the device and payload |
||
26 | * Weight of the strings in the total weight! |
||
27 | * Is the spaceship boyant! Should it be? |
||
28 | * Fishing line for everything? |
||
29 | ** Need to test the different strings at -60C to see if they get brittle |
||
30 | * Improve the predictive model stuff |