Debrief Notes for Test Launch

Issues

  • List of all tools in hanger
  • Checklist of all parts
    • Assembly instructions
  • Better GPS tracking capability.
    • Last longer, more frequent
  • Webcam phone GPS and video needs to re-enable when signal lost
  • Permit workflow needs to be improved
  • Use the westward winds at the beginning to limit how far East
  • More free lift
    • Way to measure the lift speed
  • Payload more visible
    • Strobe lights
    • Reflectors
    • Metal to show up on radar
  • Package stays together. (Test)
  • Sea recovery needs to be optimized
    • Hooks and loops
    • Markers that stick up from the water
  • Remind the artist that the spaceship must be light
    • Get lots of spaceships early on to test and destroy!
  • Make sure water cannot collect on the device and payload
  • Weight of the strings in the total weight!
  • Is the spaceship boyant! Should it be?
  • Fishing line for everything?
    • Need to test the different strings at -60C to see if they get brittle
  • Improve the predictive model stuff