h1. Flight 3
2
3
h2. Timeline
4
5
* 9:00 Most have arrived at CCP and are eating breakfast
6
* 9:30 the team arrives at hofro (Naval Research) to prepare the launcy
7
* 9:45 baloon assembly begins
8
* 10:00 cut down wire in place at the top of parachute
9
* 10:15 cut down wire being put into the foam box
10
* 10:20 Ragnar fucking [sic] about with ropes
11
* 10:25 Space ship hung up on the device
12
* 10:30 CCP start the desktop live stream!
13
* 10:35 Small red HR balloon released to see general wind direction
14
* 10:45 trying to get a signal from the Spot GPS tracker
15
* 10:50 camera in foam boxes being mounted
16
* 11:00 balloon filling process started!  Takes about 22 minutes.
17
* 11:15 Helium flowing into balloon
18
* 11:53 Kristjan calls the tower
19
* 11:55 Box sealed, trackers checked.  Spot at 11:22
20
* 12:03 Cameras on 
21
* 12:19 Authority 1 approves, other asks for more information: ascent, heading.  Vikar has to reset the cutoff
22
* 12:23 Given the go ahead!
23
24
Notes by Halldor, transcribed by Joe.